Installation

Installation options

Champion Door fabric fold-up doors and partitions can be installed in many different ways depending on the functional application: directly in the opening, inside, or outside the opening:

 cd eng

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 Champion Door fabric fold-up doors and partitions are delivered installation-ready. Depending on the location, the installation takes 1-5 workdays. With every door we also provide a door-specific folder containing the following documents:

- Complete operating instructions
- Technical information and drawings
- Servicing log
- EC Declaration of Conformity
- Certificate of Guarantee
- Manufacturer’s insurance for lift inspections can also be ordered separately

 

Installation information

 EN installation instructions picture 10 2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EN US installation instructions table 10 2016 B